Windows Installed as Temperatures Rise

IMG_6540

The Schar Hall construction crew completed the window installation on the north side of the building this week. It does seem a bit ironic that this task was finished in 70-degree temperatures, just in time to crack them open and enjoy the breeze.

The only remaining openings on this side of the building are for the Snow Family Grand Atrium (far right) and the “Under the Oaks” entrance to the facility (far left).

This entry was posted in Expansion. Bookmark the permalink. Follow any comments here with the RSS feed for this post. Comments are closed, but you can leave a trackback: Trackback URL.