Expansion Blog
-
Recent Posts
Archives
Monthly Archives: June 2015
Bobcat on the Premises
Yes, a Bobcat! Technically, that piece of machinery is a skid steer loader. (We had to look it up.) But the brand name is Bobcat. commexpansionMore Posts
Posted in Expansion
2 Comments
Watch Your Step
As part of Elon’s busy summer, crews have removed the concrete walkways in front of McEwen in preparation for new brick sidewalks, which will match those found elsewhere on campus. Ever wonder what life is like for a brick on Elon’s campus? You’re in luck! The members of FreshTV 2014 profiled Elon’s bricks in a short video segment. Thanks to … Continue Reading
Posted in Expansion
Leave a comment
Digging the Foundation
We can confirm – as if that big pile of dirt didn’t give it away – that the construction crew has started digging the foundation for the School of Communications’ new two-story building. The facility will be named Dwight C. Schar Hall, in recognition of Elon parents Dwight and Martha Schar. commexpansionMore Posts
Precision with an Excavator
A tip of the cap to the excavator operator removing the concrete sidewalk June 17 in front of McEwen Communications Building. During one stretch, the operator had to lift each bucketload over a lamppost to get to a waiting dump truck. Job well done! commexpansionMore Posts
Posted in Expansion
Leave a comment
Heavy Machinery Parking Only
The McEwen parking lot is now filled with heavy machinery instead of cars. A massive hole can’t be far behind for the foundation of the new 45,000-square-foot facility that will connected to McEwen. commexpansionMore Posts
Posted in Expansion
809 Comments